+ New Topic or Question
Page 2 of 23 FirstFirst 1 2 3 4 12 ... LastLast
Threads 21 to 40 of 450

Forum: Photovoltaic Forum

Alternative Energy Forum including wind, solar, inverter discussions

    • Replies: -
    • Views: -
    02-11-10 07:26 PM Go to last post
  1. Application of Table 310.15(B)(3)(c)

    Please Provide your feedback and interpretation of 310.15(B)(3)(c) for the Scenario below " EMT conduit with 8 conductors running 40 feet on rooftop...

    Started by UMirza on 05-29-13
    • Replies: 2
    • Views: 141
    05-29-13 08:42 AM Go to last post
  2. AFCI

    I had a conversation with our leasing company. They asked us if we were installing AFCI protected inverters. I said no obviously didnt know that...

    Started by Joe Crecca on 05-24-13
    • Replies: 3
    • Views: 276
    05-24-13 03:13 PM Go to last post
  3. Service Disconnect

    Look at a service disconnect (for a pv install that was a line side tap) that was rated for 200 amps and the fuses are 150 amp so they ran 2/0 copper...

    Started by newt on 05-24-13
    • Replies: 5
    • Views: 202
    05-24-13 01:02 PM Go to last post
  4. DC Circuit Sizing Question

    I am sizing the circuit from the combiner box to the inverter. The Isc is 9.24A, and there are 18 strings in parallel. Aluminum conductors are being...

    Started by Andrew445 on 05-24-13
    • Replies: 2
    • Views: 171
    05-24-13 11:34 AM Go to last post
  5. High-Leg Delta-Stinger Leg Service - OCPD rating for AC compiner Panel- Solar Project

    Hi All, I am looking for an advice and guidance in this particular project. I am connecting 3 single phase solar inverters into a 3 phase ac...

    Started by UMirza on 05-23-13
    2 Pages
    1 2
    • Replies: 10
    • Views: 417
    05-24-13 08:11 AM Go to last post
  6. NEC 690.8

    I have just had an interesting interpretation of NEC 690.8 and would appreciate comments. I designed a solar system with four arrays/strings using...

    Started by Cal Elliott on 05-17-13
    2 Pages
    1 2
    • Replies: 11
    • Views: 507
    05-21-13 07:21 PM Go to last post
  7. Does neutral of microinverter

    Does the neutral of a microinverter count as a current carrying conductor for ampacity adjustment per 310.15? (2008NEC). Contractor has ten...

    Started by inspector23 on 05-20-13
    2 Pages
    1 2
    • Replies: 10
    • Views: 325
    05-21-13 02:14 PM Go to last post
  8. Transformer question

    I have three 20kW 480V 3 phase 4 wire inverters that need to interconnect with a 208V service through a step down transformer. I have been advised...

    Started by ggunn on 05-16-13
    2 Pages
    1 2
    • Replies: 18
    • Views: 478
    05-19-13 05:19 PM Go to last post
  9. Location of photovoltaic disconnecting means

    The exception to 690.14 (C)(1) states installations that comply with 690.31(E) shall be permitted to have the disconnecting means located remote from...

    Started by Leo1 on 05-16-13
    pv utility disconnect
    • Replies: 7
    • Views: 312
    05-16-13 06:15 PM Go to last post
  10. Ex. grid tied PV system, wanting to add stand by generator and battery bank UPS

    Hi all, I need help designing a unique Hybrid UPS system. Current System Details: Electrical- 400 amp split system (150 & 100 Ampo mains +...

    Started by Manny Renteria on 05-06-13
    • Replies: 2
    • Views: 233
    05-16-13 08:40 AM Go to last post
  11. Supply-Side PV Connection

    Article 705.12(A) states the sum of the rating of all overcurrent protection device connected to the "power production sources" cannot be more than...

    Started by Leo1 on 05-13-13
    supply-side utility tie
    • Replies: 9
    • Views: 342
    05-14-13 06:12 PM Go to last post
  12. Grounding a PV System

    When installing a supply-side disconnect to feed a new PV system the NEC states a main bonding jumper must be placed between the grounded conductor...

    Started by Leo1 on 05-13-13
    grounding electrodes, main bonding jumper, service ground
    • Replies: 2
    • Views: 214
    05-14-13 07:03 AM Go to last post
  13. PV Earth Connection

    Is it required, or good practice, to drive a couple ground rods at the PV array disconnect switch, especially is the PV array and disconnect is not...

    Started by Leo1 on 05-13-13
    grounding pv array system, supplemental grounding
    • Replies: 2
    • Views: 190
    05-14-13 06:56 AM Go to last post
  14. 3 PHASE 3 WIRE 250 VOLT TIE IN

    Hello I am looking into a 175 kw PV system tht will get line side tied back into a 3 phase 3 wire 250 volt system. Obviously this is a unique...

    Started by mdillonelectrician on 05-07-13
    • Replies: 5
    • Views: 315
    05-10-13 12:17 PM Go to last post
  15. Utility Interactive String Level Blocking Diodes

    I was hoping to get some assistance about blocking diodes at the string level (source circuit.) I have an RFP design requirements that the...

    Started by JasonC on 05-02-13
    • Replies: 4
    • Views: 318
    05-06-13 07:44 PM Go to last post
  16. Do all combiner boxes need a disconnect?

    I plan on installing a combiner box to combine 5 strings into 1 than runs to the inverter. Is a disconnect required?

    Started by sketchy on 05-02-13
    2 Pages
    1 2
    • Replies: 19
    • Views: 624
    05-04-13 11:13 AM Go to last post
  17. Residential PV Wiring Errors

    Installations with transformerless inverters such as the PVI 6000 TL are being installed and connected to arrays wired as a grounded system in our...

    Started by shortcircuit2 on 03-07-13
    2 Pages
    1 2
    • Replies: 17
    • Views: 1,630
    05-01-13 09:46 PM Go to last post
  18. Hybrid System , PV, Battery, Generator, ATS Confused Designer? Parallel feeders &ocpd

    Ok so I have a designer/contractor who is proposing this system with the ats, generator, pv, batteries, etc. Now the one thing that I have a...

    Started by TrickleCharge on 04-19-13
    8 Pages
    1 2 3 ... 8
    • Replies: 72
    • Views: 1,975
    05-01-13 01:20 PM Go to last post
  19. 480 Volt Wye-Wye Transformer

    Hi guys, I have a project I have hit a snag with. I have an AE 333Nx inverter I am tying to 3 phase 4 wire wye grounded gear. The inverter...

    Started by curcie on 04-25-13
    2 Pages
    1 2
    • Replies: 16
    • Views: 717
    04-30-13 08:46 PM Go to last post
  20. Solar Module Grounding Method

    Panel Maker #1...Here is LG Instructions http://www.lg.com/us/commercial/documents/lg-installation-guide-g3.pdf for their S1C-G3 series panels?...

    Started by shortcircuit2 on 04-25-13
    • Replies: 2
    • Views: 354
    04-30-13 08:03 AM Go to last post

+ New Topic or Question

Forum Information and Options

Thread Display Options

Use this control to limit the display of threads to those newer than the specified time frame.

Allows you to choose the data by which the thread list will be sorted.

Order threads in...

Note: when sorting by date, 'descending order' will show the newest results first.

Icon Legend

Contains unread posts
Contains unread posts
Contains no unread posts
Contains no unread posts
More than 15 replies or 150 views
Hot thread with unread posts
More than 15 replies or 150 views
Hot thread with no unread posts
Closed Thread
Thread is closed
Thread Contains a Message Written By You
You have posted in this thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts