Please Provide your feedback and interpretation of 310.15(B)(3)(c) for the Scenario below " EMT conduit with 8 conductors running 40 feet on rooftop...
I had a conversation with our leasing company. They asked us if we were installing AFCI protected inverters. I said no obviously didnt know that...
Look at a service disconnect (for a pv install that was a line side tap) that was rated for 200 amps and the fuses are 150 amp so they ran 2/0 copper...
I am sizing the circuit from the combiner box to the inverter. The Isc is 9.24A, and there are 18 strings in parallel. Aluminum conductors are being...
Hi All, I am looking for an advice and guidance in this particular project. I am connecting 3 single phase solar inverters into a 3 phase ac...
I have just had an interesting interpretation of NEC 690.8 and would appreciate comments. I designed a solar system with four arrays/strings using...
Does the neutral of a microinverter count as a current carrying conductor for ampacity adjustment per 310.15? (2008NEC). Contractor has ten...
I have three 20kW 480V 3 phase 4 wire inverters that need to interconnect with a 208V service through a step down transformer. I have been advised...
The exception to 690.14 (C)(1) states installations that comply with 690.31(E) shall be permitted to have the disconnecting means located remote from...
Hi all, I need help designing a unique Hybrid UPS system. Current System Details: Electrical- 400 amp split system (150 & 100 Ampo mains +...
Article 705.12(A) states the sum of the rating of all overcurrent protection device connected to the "power production sources" cannot be more than...
When installing a supply-side disconnect to feed a new PV system the NEC states a main bonding jumper must be placed between the grounded conductor...
Is it required, or good practice, to drive a couple ground rods at the PV array disconnect switch, especially is the PV array and disconnect is not...
Hello I am looking into a 175 kw PV system tht will get line side tied back into a 3 phase 3 wire 250 volt system. Obviously this is a unique...
I was hoping to get some assistance about blocking diodes at the string level (source circuit.) I have an RFP design requirements that the...
I plan on installing a combiner box to combine 5 strings into 1 than runs to the inverter. Is a disconnect required?
Installations with transformerless inverters such as the PVI 6000 TL are being installed and connected to arrays wired as a grounded system in our...
Ok so I have a designer/contractor who is proposing this system with the ats, generator, pv, batteries, etc. Now the one thing that I have a...
Hi guys, I have a project I have hit a snag with. I have an AE 333Nx inverter I am tying to 3 phase 4 wire wye grounded gear. The inverter...
Panel Maker #1...Here is LG Instructions http://www.lg.com/us/commercial/documents/lg-installation-guide-g3.pdf for their S1C-G3 series panels?...
Use this control to limit the display of threads to those newer than the specified time frame.
Allows you to choose the data by which the thread list will be sorted.
Order threads in...
Note: when sorting by date, 'descending order' will show the newest results first.
Forum Rules