I am evaluating a data center emergency power off (EPO) system that a client designed and have been told there is a descrepancy between NFPA 70 and NFPA 75 but I cannot find an issue between these two codes.
Does anyone know of such a descrepancy?
The design has EPO pushbuttons to shutdown the power to electronic equipment, the HVAC, the UPss and he even went one step further and has a kill the whole building mounted outside the building in case the first responders need to kill the building.
Thanks,
Willie