I have to install a three gang meter base.Every time in the past,I would simply feed into the back side of meter base.With this method I would utilize SER type cable and connectors.Does anyone see a violation with this method?
What if I were to sleave out of the back with PVC? Would I have to use a female adapter and connector once I got into the building?
Thanks
What if I were to sleave out of the back with PVC? Would I have to use a female adapter and connector once I got into the building?
Thanks