Can 4" sch 40 pvc conduit be run through an unfinished basement in Connecticut?
Or would it have to be "4 galv pipe?
PO wants to come in with the service conductors unprotected from the hand hole in the side-walk at the front of the building... go through the foundation... go about 60'.... and go through the foundation again to the rear of the building. This would be a cold sequence breaker meter combo. There's No place to put the meter at the front of the building.
Or would it have to be "4 galv pipe?
PO wants to come in with the service conductors unprotected from the hand hole in the side-walk at the front of the building... go through the foundation... go about 60'.... and go through the foundation again to the rear of the building. This would be a cold sequence breaker meter combo. There's No place to put the meter at the front of the building.