Just looking at some pictures for a new project im going out to tomorrow. I can't figure out the benefit of how this is installed. There is a meter outside with what looks like one 2" conduit incoming in a meter. Then on the otherside of the meter (in the garage) there are 2 panels with (2) 4 pole MCBs in each. On the panel schedule it says "subpanel" So im assuming the one panel on the left is feeding the one on the right. Why are there (2) 4 pole MCBs? Something isn't adding up here to me, any opinions?