I'm looking at a Nema 3R Cutler Hammer 3000A service entrance on a strip mall. it has several small tenant sections (each of which has section ratings of 3000A) and two large tenant sections (each of which has section ratings of 400A and supply ratings of 3000A). The management company would like to add another 400A large tenant, but there is no room for another section. Do you think it would be possible (or rea$onable) to replace the innards of one of the 400A sections with an 800A one with two 400A meters and 4 200A breakers?