I need to feed a small building at our plant which had it's seperately-metered electrical service abandoned years ago. I need 3-phase 208Y/120 power and I have 480 available in a nearby building.
I plan to go underground with 480 to the seperate building to a fused disconnect, then to a transformer and panel and want to make sure I'm thinking this through correctly.
I need to connect the feeder ground to the disconnect enclosure and bond it to the GES. I then need to also bond SDS to the GES, either in the transformer or the panel. Is that correct?
I plan to go underground with 480 to the seperate building to a fused disconnect, then to a transformer and panel and want to make sure I'm thinking this through correctly.
I need to connect the feeder ground to the disconnect enclosure and bond it to the GES. I then need to also bond SDS to the GES, either in the transformer or the panel. Is that correct?