It is not required to correct power factor, it may be desirable to do so. Even if we were talking about utility power here, the main desire to correct power factor is to avoid low power factor penalties from the utility. There are other benefits, but they are often small compared to lowered penalties. There may be more benefits to PF correction for on site generation, but is not a requirement to install PF correction either.