Hello......
I'll be running nm in attic area.
The attic is finished in the center, and has knee walls on both sides (peak down to soffit where it's dead area and they box it)
The area on the other side of these walls are very low and small but it will get me to where I need to be.
No one in there right mind goes into this area ( except little birds that crap all over and I guess me :- } )
Can I run the nm perpendicular to the joists laying them on top of the joists and stapling them.?
Hug the knee wall side or soffit side?
Maybe use a 2X4 as a runner with them?
Or am I drilling?
Thank you
Rich
I'll be running nm in attic area.
The attic is finished in the center, and has knee walls on both sides (peak down to soffit where it's dead area and they box it)
The area on the other side of these walls are very low and small but it will get me to where I need to be.
No one in there right mind goes into this area ( except little birds that crap all over and I guess me :- } )
Can I run the nm perpendicular to the joists laying them on top of the joists and stapling them.?
Hug the knee wall side or soffit side?
Maybe use a 2X4 as a runner with them?
Or am I drilling?
Thank you
Rich