  1. Here ya go. ...

    Here ya go.
    http://www.pentairthermal.com/Images/EN-RaychemH921120V-IM-H55399_tcm432-26295.pdf
    I don't know if it is the same as the one I bought about ten years ago. But I pulled the Device out...
  2. I found a very old spec book and it listed a 500...

    I found a very old spec book and it listed a 500 to 1000K ...
    Thanks for the info , I suppose I need a new Megger.
  3. Leviton sells one that comes with a Raychem...

    Leviton sells one that comes with a Raychem product. I have not seen it anywhere else.
  4. I did not notice that about the Raychem, is that...

    I did not notice that about the Raychem, is that for Winterguard wet ?
  5. The reading depends on the type of cable and...

    The reading depends on the type of cable and manufacture.
  6. Yes these cables are available in rolls that you...

    Yes these cables are available in rolls that you make up.
    Tyco- raychem- winter guard - and others 120, 240v
    nelson Heat
    are some.

    use a Megger to check the cable. Visially check the cable...
  7. Replies
    14$$
    Views
    369

    Thanks, I was told by a fellow contractor I could...

    Thanks, I was told by a fellow contractor I could not.
  8. Replies
    14$$
    Views
    369

    #6 NM-cable

    I was wondering. Can you place a 60 amp breaker on #6 NM wire. using the next higher standard breaker size.
    of course providing that there are no other derating , bundling or other issues.

    ...
  9. Replies
    15$$
    Views
    452

    Were you there at the time of inspection? If I...

    Were you there at the time of inspection?
    If I were I would have ripped those buggers out faster than he could write a correction notice.
    If they were not a required luminaire then he would have...
  10. Replies
    3$$
    Views
    148

    Wow did ot know that the NEC put that section in...

    Wow did ot know that the NEC put that section in and then took it back out again?
    Flip Flop ,,
  11. You mean GFCI protection for the feeder.

    You mean GFCI protection for the feeder.
  12. Edward thanks for that post that is a pretty...

    Edward thanks for that post that is a pretty handy product when you have problem like a pipe.


    To the OP this install is not all that bad as certain bar lights it would be acceptable, not great...
  13. When cutting concrete on grade make sure the slab...

    When cutting concrete on grade make sure the slab is not a tension cable type. Cutting into one of those is dangerous and expensive.
  14. Replies
    19$$
    Views
    655

    Confused! huh, You have a business relationship...

    Confused!
    huh, You have a business relationship with the OP?

    In our locals, The UFFER would have to be signed off prior to the pour. It's a seperate item on the ispection card. Someone could be...
  15. Replies
    22$$
    Views
    654

    I am a bit confused, The OP speaks of Bonding and...

    I am a bit confused, The OP speaks of Bonding and landing supply ( line side Nuetrals) being landed in the CT compartment.
    I have never heard of not landing the nuetral in the CT. Maybe your area...
  16. Replies
    19$$
    Views
    655

    In our counties the CCE is part of the footing...

    In our counties the CCE is part of the footing form inspection. That is supposed to be there or does not pass. A missed one may need to be re poured.:happysad:
  17. Replies
    19$$
    Views
    704

    Some printers just dont want to get powered off...

    Some printers just dont want to get powered off simply by turning off the power. They actually get damaged sometimes.
  18. Replies
    93$$
    Views
    4,711

    I don't think Malice as that would mean that the...

    I don't think Malice as that would mean that the intention of the EE was malicious. I do however it it the way the EE is dealing with

    250.122(b).


    Also it takes time to talk over a problem, it...
  19. Replies
    19$$
    Views
    704

    I don't think the Energy code intent was to turn...

    I don't think the Energy code intent was to turn off critical equipment such as computers , The intent is for stuff like , Lights, monitors, non esential perifrial equpment.
  20. Replies
    93$$
    Views
    4,711

    I really am sorry , Sorry for being so abrasive....

    I really am sorry , Sorry for being so abrasive. I have had many projects go afoul and cost me tens of thousands over the years due to incomplete , inaccurate or just blatant not code compliant...
  21. Replies
    93$$
    Views
    4,711

    I am sorry if I offended some. I let myself get...

    I am sorry if I offended some. I let myself get roped into this stuff again.
    I just have had too much experience with arrogant EE.
    They are god and the EC must cave in.
  22. Replies
    20$$
    Views
    1,088

    Looks like a accident in the waiting

    Looks like a accident in the waiting
  23. Replies
    93$$
    Views
    4,711

    Engineers need to go before the boards that...

    Engineers need to go before the boards that license them and face diciplinary actions for their incompetence or willful fudging of the numbers or specs knowing they are wrong.
    Pay fines or loose...
  24. Replies
    93$$
    Views
    4,711

    You guy's are correct. The problem is some EE...

    You guy's are correct.

    The problem is some EE and contractors think they can bid projects based on change orders to make the profit.
  25. Replies
    93$$
    Views
    4,711

    Bingo! Yes I would belive for voltage drop. ...

    Bingo!
    Yes I would belive for voltage drop.
    The problem is they do not specify a larger upsized grounding conductor.

    That to me is Fraud. as to me the EE is trying to evade the upsizing of...