  1. Replies
    6$$
    Views
    175

    If there is a minimum distance required it's not...

    If there is a minimum distance required it's not in the NEC. Maybe some will chime in with some other code.
  2. Thread: Swivel covers

    by infinity
    Replies
    2$$
    Views
    163

    EMT cannot support a fixture or other equipment.

    EMT cannot support a fixture or other equipment.
  3. Replies
    19$$
    Views
    534

    If I remember correctly NYC allows MC cable for...

    If I remember correctly NYC allows MC cable for commercial work and NM cable for single family dwellings.
  4. Replies
    5$$
    Views
    250

    The detached structure should have its own GES...

    The detached structure should have its own GES making the GEC quite short. If you meant EGC with the feeder than yes that needs to be increased in size if you increase the size of the ungrounded...
  5. Replies
    8$$
    Views
    253

    Just my opinion but if I were to do any work on...

    Just my opinion but if I were to do any work on this pool I would make sure that everything, even the existing stuff is properly bonded. Improperly installed pols are potentially dangerous and could...
  6. Replies
    9$$
    Views
    333

    I agree with Dave. Unless he can cite a specific...

    I agree with Dave. Unless he can cite a specific code violation the panel is fine where it is.
  7. Replies
    8$$
    Views
    253

    Using the rebar with 400 ohms of resistance is...

    Using the rebar with 400 ohms of resistance is useless and dangerous. Have you checked the existing metal parts to see what the resistance is between them and the pool pump? If it's near zero then...
  8. Replies
    8$$
    Views
    253

    You cannot use a ground rod. Can you find the...

    You cannot use a ground rod. Can you find the equipotential bonding conductor that is bonding the pool pump or other equipment and run the new one to it?
  9. Unless the heater is running at full load for 3...

    Unless the heater is running at full load for 3 or more hours it is not considered a continuous load according to the NEC. Storage type water heater require the 125% factor because is an NEC...
  10. Replies
    22$$
    Views
    830

    Given the popularity of food trucks maybe they...

    Given the popularity of food trucks maybe they should be covered under the NEC but for now they're not.
  11. Replies
    9$$
    Views
    272

    Unless there is a local code if someone is...

    Unless there is a local code if someone is telling me to do something then it better be in the book (NEC). You're not antagonizing someone if they're wrong.
  12. Replies
    9$$
    Views
    272

    It can be bare. The inspector is incorrect.

    It can be bare. The inspector is incorrect.
  13. Replies
    6$$
    Views
    251

    No required.

    No required.
  14. Replies
    18$$
    Views
    436

    Should look like this with the steel columns...

    Should look like this with the steel columns originating at the footings.

    http://www.newsteelconstruction.com/wp/wp-content/uploads/2012/08/aDSC_1642.jpg
  15. Replies
    18$$
    Views
    436

    That is not building steel which is an electrode...

    That is not building steel which is an electrode according to the NEC. It's simply an isolated piece of steel supported by a poured concrete structure.
  16. Thread: Ibew jw test

    by infinity
    Replies
    12$$
    Views
    579

    For us you start as a TA1 (temporary apprentice...

    For us you start as a TA1 (temporary apprentice 1st year). If you want to take a test and get "slotted" based on your test results you will become a helper not an apprentice and not be in the...
  17. Replies
    18$$
    Views
    436

    You cannot just chop out some concrete and...

    You cannot just chop out some concrete and connect the GEC to a piece of rebar.
  18. Replies
    18$$
    Views
    436

    If it had building steel then that's normally...

    If it had building steel then that's normally what you would use. Common grounding electrodes are typically for poured concrete buildings.
  19. Replies
    18$$
    Views
    436

    If there is building steel then that ground bus...

    If there is building steel then that ground bus would be connected it to it somehow. Not sure why they're showing a 400 kcmil Al conductor when the largest ever required would be 250 Al.
  20. Replies
    3$$
    Views
    163

    Depending on the scope of the project it can vary...

    Depending on the scope of the project it can vary widely. You have to factor in temporary hoists as well as temp power for the permanent elevators. To that add all of your lighting and power needs...
  21. Thread: Ibew jw test

    by infinity
    Replies
    12$$
    Views
    579

    So they will allow you enter the NJATC program as...

    So they will allow you enter the NJATC program as a second or third year apprentice or do you need to start from the beginning?
  22. Thread: Ibew jw test

    by infinity
    Replies
    12$$
    Views
    579

    Which local?

    Which local?
  23. Replies
    36$$
    Views
    1,156

    They do make MC cable with individually marked...

    They do make MC cable with individually marked conductors.
    17795
  24. Replies
    36$$
    Views
    1,156

    Can you use a tapered threaded metal nipple into...

    Can you use a tapered threaded metal nipple into a straight threaded female adapter or do you run into the same incompatible thread issues?
  25. Replies
    36$$
    Views
    1,156

    Same issue with SE cable connectors. Must be 90%...

    Same issue with SE cable connectors. Must be 90% of all residential services around here use SE cable into the meter pan hub, every one of those is a violation, thankfully those doing the...