Search:

Type: Posts; User: infinity

Page 1 of 8 1 2 3 4

Search: Search took 1.97 seconds.

  1. This was a Delta-WYE reverse wired transformer? ...

    This was a Delta-WYE reverse wired transformer?

    Welcome to the Forum. :)
  2. Replies
    9$$
    Views
    170

    The confused party stopped reading the...

    The confused party stopped reading the requirement at the end of this part, "(2)All service enclosures containing service conductors". If those were the only words in that sentence then i can see it...
  3. Replies
    9$$
    Views
    170

    That's exactly what it means, now I just need to...

    That's exactly what it means, now I just need to convince someone else who thinks that it relates to any raceway connected to a service even if it contains feeder conductors. :rant:
  4. Replies
    9$$
    Views
    170

    250.92(A)(2) "Interposed"

    I'm looking for some opinions as to what the word interposed means in this section. I'm pretty sure that I understand the meaning but I'm hearing some rather crazy interpretations. :roll:
  5. Replies
    16$$
    Views
    433

    If it's a standard LB measuring is basically...

    If it's a standard LB measuring is basically pointless because for a 2" raceway you'll almost never get near the minimum requirement of 12". However as you've mentioned you can use the conductor size...
  6. Replies
    18$$
    Views
    470

    Sill plates are not required by the NEC. Using...

    Sill plates are not required by the NEC. Using them with #4/0 SER is likely a violation anyway since you cannot maintain the 5X bending radius as you've found when installing it.
  7. Replies
    5$$
    Views
    129

    If they say to bring the 2005 then bring the...

    If they say to bring the 2005 then bring the 2005. If you don't have one you can get used ones on Ebay.
  8. Replies
    32$$
    Views
    663

    I have never seen anyone make an attempt to...

    I have never seen anyone make an attempt to ensure that the conductor lengths were equal.
  9. Replies
    10$$
    Views
    451

    You need to find a resource for the actually...

    You need to find a resource for the actually legal requirements for when permits are and aren't required. Here in NJ it specified in the NJ-UCC.
  10. Replies
    16$$
    Views
    433

    Since the voltage is less than 250 volts to...

    Since the voltage is less than 250 volts to ground the bonding bushing is not required even if you have concentric or eccentric KO's. These are feeder conductors not SEC's so the rule for service...
  11. Thread: box supports

    by infinity
    Replies
    16$$
    Views
    372

    You can. As Roger mentioned the rating of the...

    You can. As Roger mentioned the rating of the wall may come into play.
  12. Replies
    32$$
    Views
    663

    The NEC would require some process like the one...

    The NEC would require some process like the one you've mentioned to get the lengths to be equal.
  13. Replies
    9$$
    Views
    255

    Don't all bathroom receptacles require GFCI...

    Don't all bathroom receptacles require GFCI protection regardless of their proximity to water?
  14. Replies
    41$$
    Views
    997

    The NEC doesn't specify so you could go 24" with...

    The NEC doesn't specify so you could go 24" with a space and then 24" more with a space, repeat as necessary. ;)
  15. Replies
    32$$
    Views
    663

    For arguments sake the conductors lengths are...

    For arguments sake the conductors lengths are exactly the same. You could have a few conduits on the same rack and end up with several feet of difference in the conductor length. The question is are...
  16. Replies
    41$$
    Views
    997

    You lost me.:? Did you read the code section I...

    You lost me.:?
    Did you read the code section I provided?
  17. Replies
    41$$
    Views
    997

    Where the bundling is more than 24". ...

    Where the bundling is more than 24".


    310.15(B)(3).
  18. Replies
    32$$
    Views
    663

    Parallel Feeder Conduits

    Someone is trying to convince me that EMT runs for parallel feeders have to be physically next to each other (they're on two different tiers of a conduit rack). The conductor length for each conduit...
  19. Thread: Meter Points

    by infinity
    Replies
    5$$
    Views
    255

    Where are you seeing 3,6,9 and 12 point meters? ...

    Where are you seeing 3,6,9 and 12 point meters? Common 3Ø meters are 10 point.
  20. Replies
    12$$
    Views
    585

    If you splice and pigtail all of your work then...

    If you splice and pigtail all of your work then this is easy, energize and just go the last device on the circuit and check for voltage between H-N and H-G. Make sure each pigtail end is insulated...
  21. Replies
    8$$
    Views
    279

    George what app are you using?

    George what app are you using?
  22. Replies
    23$$
    Views
    721

    Would that affect two washers with an ampacity of...

    Would that affect two washers with an ampacity of 9.8 amps each on a 20 amp circuit?
  23. I know we're all passionate about being American...

    I know we're all passionate about being American and America but this thread is veering towards the political side and will be gone if it continues to move in that direction. Also a reminder about...
  24. Replies
    5$$
    Views
    302

    It is possible that a small amount of current is...

    It is possible that a small amount of current is flowing on the GEC to the electrode. You could disconnect the other end first just to be safe. If this were a city system, water pipe electrode...
  25. Replies
    12$$
    Views
    368

    Unless specified that they need to be 20 amp I...

    Unless specified that they need to be 20 amp I would use up the 15 amp devices and not think twice about it. 8-)
Results 1 to 25 of 200
Page 1 of 8 1 2 3 4