I'm wiring up some moduler furniture (cubicles) in an office tomorrow. The pre-wired flex has three circuits feeding each module. I thought in the 2005 NEC their is a code that says these three circuits must be terminated on a three pole circuit breaker, or be able to simultaneously disconnect all ungrounded conductors with aproved handle-ties. I can't seem to find it, or maybe I'm wrong. Any help would be greatly appreciated.