    Commissioning

    Can anyone explain the difference between start up and commissioning? Also, the difference between commissioning authority and commissioning agent.

    Thank you,

  2. #2
    Join Date
    Aug 2007
    Posts
    2,754
    start up - initial or further start up and testing

    commissioning - final approval by the commisioning authority during which all items are shown to be 100% complete, 100% functional, and are final tested (shown to be in optimal working order and functioning perfectly) for examination and approval (acceptance) by the authority (ies) (this occurs after all preliminary testing and corrective actions and punch out)

    I believe the agent is the person(s) who has authority to give final approval and acknowledgement that the facility can be immediately placed on active service/duty.
    Last edited by nakulak; 03-16-09 at 06:58 PM.

  3. #3
    Join Date
    Mar 2006
    Location
    Westchester County, New York
    Posts
    8,169
    Many times, commissioning is performed by other than the contractor...maybe someone the contractor hires.
    There will be a certificate produced saying the installation performs as it was engineered to perform.
    Depending on the type of job, it could be some $$$
    Instructor, Industry Advocate

  4. #4
    Join Date
    Jul 2007
    Location
    Iowegia
    Posts
    16,829
    Quote Originally Posted by Pierre C Belarge View Post
    Many times, commissioning is performed by other than the contractor...maybe someone the contractor hires.
    There will be a certificate produced saying the installation performs as it was engineered to perform.
    Depending on the type of job, it could be some $$$
    Sometimes, it comes standard with the equipment.