Thread: Drilling I-Beams and bar joists ?

  1. #1
    Join Date
    Jul 2008
    Location
    North Of Tampa Fl
    Posts
    292

    Drilling I-Beams and bar joists ?

    Can you drill metal I-beams ,bar joist's in a manufacturing plant to hang box's ,strap's etc .... Is there a code on this ?

  2. #2
    Join Date
    Mar 2004
    Location
    Arizona
    Posts
    3,913
    Quote Originally Posted by Davebones View Post
    Can you drill metal I-beams ,bar joist's in a manufacturing plant to hang box's ,strap's etc .... Is there a code on this ?
    There is no NEC code on it, I see it done often.
    Frank Arizona,USA

  3. #3
    Join Date
    Jul 2008
    Location
    North Of Tampa Fl
    Posts
    292
    I hear people say it will weaken the structure .All the time I've been in the trade we were allowed unless it had a fireproofing sprayed on it . Our carpenter at work is questioning this . I wanted to see what other people had to say ...

  4. #4
    Join Date
    Jul 2005
    Location
    Tennessee
    Posts
    12,641
    The building codes have a limit as to the size of holes and the placement.
    As far as I know there are no restrictions on standdard holes for mounting equipment.
    At my age, I'm accustomed to restaurants asking me to pay in advance, but now my bank has started sending me their calendar one month at a time.

  5. #5
    Join Date
    Mar 2004
    Location
    Arizona
    Posts
    3,913
    If it weakens the structure, they better find a new way to fasten the roofing to the

    beams ??
    Frank Arizona,USA

  6. #6
    Join Date
    Nov 2008
    Location
    Indiana
    Posts
    216
    A powder actuated fastener would be much faster. Otherwise, what prevents you from just using beam clamps? Not being critical, just curious.

  7. #7
    Join Date
    Nov 2007
    Posts
    1,631
    Quote Originally Posted by Davebones View Post
    I hear people say it will weaken the structure .All the time I've been in the trade we were allowed unless it had a fireproofing sprayed on it . Our carpenter at work is questioning this . I wanted to see what other people had to say ...
    carpenter? Are you talking about drilling engineered I joists (wood), or steel I beams?

  8. #8
    Join Date
    Jan 2010
    Location
    PHX, arizona
    Posts
    312
    We do it all the time and thread our rod with the 300, when they speck no beam clamps, all thread or unistrut.

    We use tex5 screws when we can.

  9. #9
    Join Date
    Sep 2004
    Location
    Durham, NC
    Posts
    5,226
    Can you drill metal I-beams ,bar joist's in a manufacturing plant to hang box's ,strap's etc .... Is there a code on this ?
    carpenter? Are you talking about drilling engineered I joists (wood), or steel I beams?
    Attention to the OP might help.. don't know... I've drilled (seems like a lot of work) beam clamped and stuck threaded rod between the joists, Tech5, shot a cap. Seems more like what the job spec's will let you do, as opposed to what one would like to do.
    If your even thirsty, your two quarts low.

  10. #10
    Join Date
    Nov 2007
    Location
    minneapolis
    Posts
    68
    we use a stud gun to weld a internal threaded stud to a beam. You can then mount a box or attach all thread.