I will be wiring a Pier with 4 boat lifts, lighting, general use rec's, and 3 shore power rec's. The water is brackish bay water, but still pretty corrosive.
This will be my first pier. I am hoping someone out there has some good experience with piers and can give me some good advice regarding materials best wiring methods (stringers are on the inside of the piles), and/or other possible pitfalls to look out for.
This pier is about 8" above avg high tide and the Datum plane is at about 2-3" below the very top of the piles. This could be a problem for supporting so I am considering pedestal mounted shore power and possibly a sistered piece of wood for GP rec's.
I have a few other ideas stirring around my head, but specific experience is worth it's weight in gold.
Thanks, in advance, for any ideas.
This will be my first pier. I am hoping someone out there has some good experience with piers and can give me some good advice regarding materials best wiring methods (stringers are on the inside of the piles), and/or other possible pitfalls to look out for.
This pier is about 8" above avg high tide and the Datum plane is at about 2-3" below the very top of the piles. This could be a problem for supporting so I am considering pedestal mounted shore power and possibly a sistered piece of wood for GP rec's.
I have a few other ideas stirring around my head, but specific experience is worth it's weight in gold.
Thanks, in advance, for any ideas.