Hameedulla-Ekhlas
Senior Member
- Location
- AFG
Go it. When you say 'moved', it implies permanency, that's what got me confused.
I't interesting about he NEC use in Afghanistan. If we have so much difficulty, in the US, applying it here and trying to untangle its intent, how could you guys deal with it when it is not even in your language?!
Not too much difficult, Our all design ( Demand factors, Cable size, Breaker size, Fire alarm system design, lightning and grounding system, distribution voltage drop calculation) site installation and implementation of electrical and mechanic as well as structure , are all based on USA Codes
In electrical we use codes such as ( NFPA 70, NFPA 72, NFPA 780 ...etc. as well as UFC code. for you UFC check this site www.wbdg.org )
that is why I have too much interesting in this forum.