I dont mean to laugh at some guys, and I'm sure we all make some silly mistakes. There was a this crew that put a panel in upside down to help save on the wire to ben. Well, the panel being upside down made the 'breaker' upside down, so the on/off is reversed and the Electrical inspector rejected the job.
There was a shut down for the first project, so now there is another shutdown for the second project to correct the panel. Its gonna take about a good 10 hrs to do it is what they plan. Moving the all the conduits attached to the panel, and refeeding the panel and having the guys come out at night to do it, I think it is an expensive mistake for just the breaker b eing upside down.
There was a shut down for the first project, so now there is another shutdown for the second project to correct the panel. Its gonna take about a good 10 hrs to do it is what they plan. Moving the all the conduits attached to the panel, and refeeding the panel and having the guys come out at night to do it, I think it is an expensive mistake for just the breaker b eing upside down.