mstrlucky74
Senior Member
- Location
- NJ
Have a 25' aluminum light pole with arm and cobra head light fixture. They are being mounted to a foundation already in place. There are about 10 of them about 100' apart. Any feed back on how long to install would be helpful. Put together on ground and install with boom truck I'm assuming. I'm thinking two guys can assemble and mount 2-3 in a 7-8 hours day.