Panel being demolished along with the feeder to the panel. I don't see how removing the feeders could be quantified as...
1. Feeder size not given..guess you could come close based on panel size.
2. the feed for the panel could come from the EMDP panel or it could be a tap on that floor, correct?
How could you even estimate disconnecting them and safe off if it's a tap? Thanks.
1. Feeder size not given..guess you could come close based on panel size.
2. the feed for the panel could come from the EMDP panel or it could be a tap on that floor, correct?
How could you even estimate disconnecting them and safe off if it's a tap? Thanks.