I have a fire rated corridor going around offices. I am penetrating the corridor with a 2" sleeve for circuits etc. above every office. I have a UL detail to install the sleeve however the building dept is asking for a detail to fill the void between the wires and the wall of the sleeve. My UL detail doesen't cover that right now. Currently I am using UL detail W-L-1453.
Thank you guys
Thank you guys