kjless
Member
- Location
- plaistow nh
I'm in a parking garage that is all precast no steel in the entire building my transformer is in the main elec em for my gec I was going to bring it in to mdp where my electrode system bonds together from the service. The only thing I saw in the bible was that the only way I could do it is if my xfmr was service rated. It would be the main service is grounded to a 20 foot piece of rebar in slab and the water main witch is next to impossible to get to what would my other options be thanks