mark32
Senior Member
- Location
- Currently in NJ
Inspector wants a standby generator to be set on a concrete pad as opposed to crushed stone we normally use. The gc poured the pad, said he stubbed a piece of rebar out the side so we can clamp to it. Is this connection needed for this install? There's much less than 20' of rebar present in the slab according to him.