We are installing a service to a new building. The main fused disconnect will be 100' from the building and we will be running underground (parallel)to the panel inside the panel. I will be installing our ground rod at the disconnect and running ground wire in each of the conduits to the panel in the building. I will be running our cold water ground and any steel ground to that panel - separate from the neutral bar ... just feeling like I?m doing something wrong having the grounds for the main service going to two different locations