If using chapter 8 for telephone and tv cable installation and you decide to install pullboxes for these conduits that contain these cables, are the pullboxes required to sized the same way that chapter 3 does or no? Do these conduits for low voltage cables (tv and telephone) follow the pullbox requirements for not exceeding 360 degrees of bends if you decide to use pullboxes?