Mr.Nobody
Member
- Location
- Philadelphia, PA
Happy holidays everyone:happyyes:
I looked at a side job this past Wednesday, for a GC I know, and its more of a favor.
His "electrician" hacked multiple feeders and stole the wire. building looks like it was wired by Edison him self:slaphead:
after cleaning all the unused junk out, bring everything involved up to current code.
I want to run 1 feed to a 200amp panel in either parallel or series to a existing one. consolidate all branch circuits into a trough. and my run will be about 120ft after I replace/repair the hacking:happysad:
My questions are in regards to the 2phase;
does voltage drop, conduit, and box fill differ because its 2phase?
same with amps, wire rating/derating?
I guess my real question is..... Is their anything I should know about two phase other then general NEC code? Because theirs two sets of conductors per leg?
Its out dated technology and I cant find any material specific to my need.
Thanks everyone :thumbsup:
I looked at a side job this past Wednesday, for a GC I know, and its more of a favor.
His "electrician" hacked multiple feeders and stole the wire. building looks like it was wired by Edison him self:slaphead:
after cleaning all the unused junk out, bring everything involved up to current code.
I want to run 1 feed to a 200amp panel in either parallel or series to a existing one. consolidate all branch circuits into a trough. and my run will be about 120ft after I replace/repair the hacking:happysad:
My questions are in regards to the 2phase;
does voltage drop, conduit, and box fill differ because its 2phase?
same with amps, wire rating/derating?
I guess my real question is..... Is their anything I should know about two phase other then general NEC code? Because theirs two sets of conductors per leg?
Its out dated technology and I cant find any material specific to my need.
Thanks everyone :thumbsup: