Results 1 to 2 of 2

Thread: New Building in old location

  1. #1
    Join Date
    May 2017
    Location
    South Carolina
    Posts
    1

    New Building in old location

    Newbie post.

    Replaced an existing wood shed with new metal shed. Original shed subpanel was powered with 3-wire feed (H,H,N) with ground rod installed at shed. New building is all metal (tube columns, siding, etc.). Would you still connect up subpanel ground and neutral similar to attached figure or would you need to separate grounds and neutral in panel?

    Thanks.
    Attached Images Attached Images  

  2. #2
    Join Date
    Dec 2006
    Location
    Chapel Hill, NC
    Posts
    32,430
    I am closing this thread, in accordance with the Forum Rules.

    This site is designed for:



    • Contractors
    • Electricians
    • Engineers
    • Inspectors
    • Instructors
    • Other electrically related individuals



    * This NEC Forum is for those in the electrical and related industries. Questions of a "How-To" nature by persons not involved in the electrical industry will be removed without notice.
    If you feel this action to be in error, feel free to contact me via PM to explain.

    A reminder to all members, if you see a questionable post, feel free to report it by clicking the button at the bottom left corner of the post.
    They say I shot a man named Gray and took his wife to Italy
    She inherited a million bucks and when she died it came to me
    I can't help it if I'm lucky



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •