Does 230.82 allow more than 6 disconnects to be installed on a service as long as however many over 6 are feeding the loads listed in 230.82? would this additional disconnect not be a service disconnect? I have been seeing solar installations installed with an additional disconnect and was told 230.82 allows this. It seems like it would be a bad idea, if the utility and fireman are only looking for 6. Any thoughts on this?