Page 2 of 2 FirstFirst 12
Results 11 to 12 of 12

Thread: Parallel Conduit Run Discount

  1. #11
    Join Date
    Sep 2012
    Location
    NJ
    Posts
    1,675
    Quote Originally Posted by cdslotz View Post
    None....I'm retired...lol

    but the last one was ConEst...
    lucky you

  2. #12
    Join Date
    Apr 2016
    Location
    Tampa, Fl
    Posts
    140

    Labor Units

    The labor unit for one run of 3" includes variables such as material organization and material staging, Scaffold / Lift positioning.
    These variables decline tremendously when running parallel runs of 3", lowering the linear footage labor rate over-all.
    The more Parallel Conduits - the less variables per unit, thus a lower labor unit per ft. or C/FT
    The majority of estimating system's labor rates are based on 100 FT. Lowering that quantity or increasing that quantity should be addressed by editing your labor unit up or down with the change in length.
    I, myself won't change the labor unit unless the run is +/- 25%.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •