    Hello. Bidding a job that's in an occupied space. We have to do the work/areas by phases as indicated on the drawings. Work will take place at nights and on weekends. We think we can get most phases done over a weekend. Any problems/question you guys see or would ask for such a heavily phased project. Never say anything like this before. Thank you.
    Attached Images Attached Images  

  2. #2
    Join Date
    Jun 2016
    Location
    Tampa, FL, USA
    Posts
    934
    I see patient rooms. Is this a hospital? A little more about what you are doing may help us help you.

    My first thoughts are: do you have to control dust and noise? Is there existing asbestos (usually above ceiling tiles). Can power be turned off in the phase without disturbing other (non-work) phases? How far away are the lay-down areas? Can you bring materials through the non-work phases? Will material fit in elevators (if multistory)?

  3. #3
    Join Date
    Sep 2012
    Location
    NJ
    Posts
    1,587
    Quote Originally Posted by Coppersmith View Post
    I see patient rooms. Is this a hospital? A little more about what you are doing may help us help you.

    My first thoughts are: do you have to control dust and noise? Is there existing asbestos (usually above ceiling tiles). Can power be turned off in the phase without disturbing other (non-work) phases? How far away are the lay-down areas? Can you bring materials through the non-work phases? Will material fit in elevators (if multistory)?
    Yes hospital. Just receptacles and lighting.

  4. #4
    Join Date
    Sep 2012
    Location
    NJ
    Posts
    1,587
    I see tracing circuits nimmg a big PIA.

  5. #5
    Join Date
    Jul 2003
    Location
    MA
    Posts
    2,016
    Shutdown of existing circuits are a problem in this type of project.
    When you shutdown a circuit for an area that you need to work in, it could affect other areas that need to stay online.
    Tim
    Master Electrician
    New England
    Yesterday's Technology at Tomorrow's Prices

  6. #6
    Join Date
    Oct 2007
    Location
    New Jersey
    Posts
    4,582
    However long you think it would take to do it as a single phase, triple it and then start adding even more time for each discontinuous block of time. You will be amazed at how much time gets chewed up hauling out equipment and material before you actually do any work. And then put it all away until next time.

  7. #7
    Join Date
    Feb 2009
    Location
    Durango, CO, 10 h 20 min without traffic from winged horses.
    Posts
    8,610
    Quote Originally Posted by gadfly56 View Post
    However long you think it would take to do it as a single phase, triple it and then start adding even more time for each discontinuous block of time. You will be amazed at how much time gets chewed up hauling out equipment and material before you actually do any work. And then put it all away until next time.
    Once in a while you get shown the light
    In the strangest of places if you look at it right. Robert Hunter

  8. #8
    Join Date
    Sep 2012
    Location
    NJ
    Posts
    1,587
    Quote Originally Posted by gadfly56 View Post
    However long you think it would take to do it as a single phase, triple it and then start adding even more time for each discontinuous block of time. You will be amazed at how much time gets chewed up hauling out equipment and material before you actually do any work. And then put it all away until next time.