An aluminum wiring mobile home went on fire. I took permits for repairs, one for FAS Alteration and one for feeder and the rods. My plan was: first installing the rods and call for inspection for those and the feeder, that according to me it is acceptable for this service. The existing rod (only one) is attached to the bottom of the pedestal (see photos) but when I opened this area, that it was without the POCO seal, I notice the condition of those (photos 2 & 3) and I stopped and called POCO for them "to redo that area" and to ask authorization to install the new 2 rods at the disconnect area (photo 1) ... I still waiting. Was I out the line for this asking? Somebody said that! Whoa, so many mobile homes in distress in this area. This mobile home, I think I posted before this particular MH, was updated with a new panel and mixing aluminum and copper wires with regular twist connectors. Next post is part of the inside wiring/panel. This job was done without permits.