electricblue
Senior Member
- Location
- Largo, Florida
- Occupation
- EC
I have a 600amp 6 meter stack I need to replace. Do I need a main OCPD? Each meter is 125amp.
Do these six meters constitute all the services on the building or are there more meters/services ?