Page 4 of 4 FirstFirst ... 234
Results 31 to 33 of 33

Thread: More than one wire under a screw terminal

  1. #31
    Join Date
    May 2005
    Location
    Richmond, Virginia
    Posts
    22,242
    Quote Originally Posted by jap View Post
    My 1st day on the job in my electrical career was on top of a grain bin installing a bindicactor with the motorized paddle. Then onto the limit switches for the indicator lights in the distributor head on a 130' grain elevator then to the vibrators to rattle the stuck feed out then to the pulse socks on the dust collector then to the controls for the cyclone blender then to the shaker for the fines and overs then to the size 5 soft start for the pellet mill then to the controls and interlocks for the auger under the mixer then to the load out auger under the scale then to the mollasus blender then to the air compressor controls then to the size 4 starter for the hammer mill then to the to the ....... oh well you get my point.
    My vote for the longest unbroken sentence on the forum.
    Code references based on 2005 NEC
    Larry B. Fine
    Master Electrician
    Electrical Contractor
    Richmond, VA

  2. #32
    Join Date
    Jan 2007
    Posts
    3,220
    Quote Originally Posted by LarryFine View Post
    My vote for the longest unbroken sentence on the forum.
    It keeps people from having to scroll down.



    Jap

  3. #33
    Join Date
    May 2005
    Location
    Richmond, Virginia
    Posts
    22,242
    Quote Originally Posted by jap View Post
    It keeps people from having to scroll down.
    Or inhale if they're reading aloud.
    Code references based on 2005 NEC
    Larry B. Fine
    Master Electrician
    Electrical Contractor
    Richmond, VA

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •