    Setting Device

    So if you have a 6” floor poke thru…kind of like the one inthe link below. Before the slab is poured what happens in terms of layout tomake sure you can install the poke thru? Would you actually set the poke thruprior to the pour? Thanks.

    https://www.legrand.us/wiremold/poke-thru-devices/recessed-poke-thru-devices/evolution-6at-poke-thru-device/6atc2p-recessed-prewired-assembly-with-surface-style-cover.aspx

  2. #2
    Join Date
    Jul 2003
    Location
    New Jersey
    Posts
    25,617
    6" plastic sleeve before the pour or core drill a 6" hole after.
    Rob