Quote Originally Posted by Megawatt* View Post
He was doing a major remodel & addition, and needed an Electrician.
He was in the process of looking for a Framing Crew, so we just went in & demo'd all of the old wiring. Pulled the permit, Relocated the Panel, and got temp power ready for Construction.
He apologized over & over, said He didn't know how to tell me, and that to get a Contractor to do the framing, he had to let him bring in all of his people to do the entire project.

I would be checking to see if these guys ever got the correct building permit to do the remodeling/addition ( with an electrician of record).

I hate to say this but once power is on a lot of these guys think they are in the clear. They don't get the Temp in Temp power.