Originally Posted by
Dennis Alwon
I always considered the riser as the conduit or cable from the meter to the point of attachment on the building. The mast was the conduit- 2"rmc around here, that went thru the roof and supported the service drop. 230.28 seems to support the mast statement.
Both utilities around me call it a riser, and the size is specified based on the size and length of their service drop conductors, but you are correct, the term should be mast.
Don, Illinois
Ego is the anesthesia that deadens the pain of stupidity. Dr. Rick Rigsby
(All code citations are 2017 unless otherwise noted)