Page 4 of 4 FirstFirst ... 234
Results 31 to 32 of 32

Thread: Working Clearance

  1. #31
    Join Date
    Feb 2003
    Location
    Illinois
    Posts
    23,732
    Quote Originally Posted by GerryB View Post
    disconnect switches, transformers, not included in dimensions in 110.26
    The language in 110.26 is very subjective. I always require that equipment disconnects have the required working clearance as it is very likely that when the equipment fails, the service tech will check voltage at that disconnect. I don't make a distinction between fused and unfused disconnects.
    Don, Illinois
    (All code citations are 2017 unless otherwise noted)

  2. #32
    Join Date
    Apr 2006
    Location
    Simi Valley, CA
    Posts
    8,397
    Quote Originally Posted by GerryB View Post
    disconnect switches, transformers, not included in dimensions in 110.26
    Thank you! I brought this up in a class and you should have heard the guff I got.
    I can build anything you want if you draw a picture of it on the back of a big enough check.

    There's no substitute for hard work....but that doesn't mean I'm going to give up trying to find one.

    John Childress
    Electrical Inspector
    IAEI / CEI / C10
    Certified Electrical Inspector

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •