Shockedby277v
Senior Member
- Location
- Michigan
I am in debate with my boss over panels being used as a raceway. Here is my situation. My job is under the 2011 code. I have a 208/120 distribution. From the distribution i have 2 - nipples coming into a 208/120 panel tub (panel A) which is then nippled into another 208/120 panel tub (panel B). So where the debate comes into play is my panel B feeders pass though panel A. He is knocking me down saying I can't use a panel as a raceway and I am saying I can as long as I meet the requirements ... My problem is the 2008 and 2011 has changed under the panelboard section (408). Looking for some ammunition