Quote Originally Posted by Dale001289 View Post
30 Minutes ago, one of our E/I inspectors walked into the engineering trailer here on site and asked me 'what's the best way to seal a twisted pair #16, shielded cable within a conduit terminating at an instrument in CID1 area'...not kidding.

I told him I'd get back with him... as you might imagine, putting together quite an email based on the above string.

how have they done it there in the past?