Results 1 to 2 of 2

Thread: Plenum

  1. #1
    Join Date
    Aug 2018
    Location
    Chicago
    Posts
    1

    Plenum


    In the Chicago code it is required to use compression EMT fittings in plenum spaces. Is this true of the 2014 NEC? I cannot seem to find any specific mention of fittings or boxes in the NEC. Along with this, is plenflex required for fixture whips?

  2. #2
    Join Date
    Dec 2006
    Location
    Chapel Hill, NC
    Posts
    33,442
    I don't believe compression fittings in a plenum is an NEC issue. Chicago has many of it's own requirements that no one else has to deal with.
    They say I shot a man named Gray and took his wife to Italy
    She inherited a million bucks and when she died it came to me
    I can't help it if I'm lucky



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •