Also there are usually multiple ways to skin a cat. I did recently do a non PV job on a switchboard which had reduced ampacity sections which would have required an engineer for a load side connection. If I was doing PV there, I would have skipped that option and lugged onto the bus splice above the CT's (which I in fact did but not for PV purposes). AFAIK most bolt patterns in this stuff conform to NEMA standard patterns so its easy to size up a lug.