clausb
Member
- Location
- Rutland, Vermont
An industrial client noticed that the electrical contractor routed raceways in the flutes of the roof deck, above the top of the bar joists. The client claims that this is a code violation; that any future roof work could damage the wiring when roofing is screwed down and the screws penetrate the deck into the space and could possible penetrate the raceway. This seems to be a valid concern, but I do not see that this is specifically prohibited by the NEC. Has anyone else heard of this concern before or if any municipalities have amendments to the code on this?