mark32
Senior Member
- Location
- Currently in NJ
You might have seen this pic on another thread, my question deals with the different ways one could run their GEC in this setup. (It was said the feeder in this pic is rated between 225 and 250 amp and inside are 6 100 amp main panels) So, assuming a 250 amp (4/0 copper) feeder, how would you install your GEC's in this scenario, specifically speaking, would you use a trough and run a tap to each panel or some other method?