I have a new inspector, who showed up today for a roff in inspection at a new home, this home is wired with romex and fiber glass nail on boxes, the inspectro said every thing was good but he want's me to strip all my wires and install all the ground crimps or green wire nuts now, before the dry wall goes up, now my question is does the nec require us to do this on a ruff in inspection?