Given the price of copper, what are thoughts about using THHN (in the appropriate size) for the GEC?
I need to update a 100-amp service in a small building. I have various scrap chunks of #6, both THHN and THW, some that I scrapped out of previous jobs and I just kept hold of.
Now I am looking at the idea of using them for the GEC to the ground rods.
Otherwise I’m going to have to go out and buy some #6 bare wire for ground, and I’m afraid to even price that out!
And yes, I know #2 awg SE wire only needs #8 GEC to ground rods.
I need to update a 100-amp service in a small building. I have various scrap chunks of #6, both THHN and THW, some that I scrapped out of previous jobs and I just kept hold of.
Now I am looking at the idea of using them for the GEC to the ground rods.
Otherwise I’m going to have to go out and buy some #6 bare wire for ground, and I’m afraid to even price that out!
And yes, I know #2 awg SE wire only needs #8 GEC to ground rods.