I am making plans to utilize power from an existing switchboard. The load I would need is 15KVA.
When should you ask the utility if there is enough power available and if existing service is adequate for the load? Is it even required for low loads such as mine?
When should you ask the utility if there is enough power available and if existing service is adequate for the load? Is it even required for low loads such as mine?