Kevin Monroe
Member
- Location
- Miami
- Occupation
- Inspector
I had an inspection today, the EC ran schedule 80 PVC on the side of a sidewalk in the customer's backyard. My thought process was, if this was mounted to the concrete wall of the house, I would pass it, but I'm saying its below grade so it should have at least 2 inches concrete, because its south Florida and I get arguments that the rock is too hard to dig. I thought about this most of the day and asked a couple of people for their opinions. I eventually failed using table 300.5, but I know the EC is an arguer. Any opinions would be greatly appreciated.