Hello experts, most of my experience is new construction or tenant infill
We did a service change at a office building that has several businesses, it took something like 2 years for the six meter pack to arrive, its a standard 120/240 service the service entrance is 500 kcmil x 2 sets. water system is PVC we installed two new ground rods. All went well except now
the inspector is saying we now need to ground the communications 'to code' what is he talking about? He says 'its in the code'. There are like 6 businesses with various systems looks to be old phone, cable internet and even a 'dish network' (satellite dish). The old telco stuff is way on the other side of the building and has what looks to be its own ground rod. What are the requirements for this? Do I run a #8 solid or a 6 or what?
I have never been called on this before, but this is a service replacement. On a new build the utility just comes out and does their thing, do I call each utility?. Are EC's responsible for grounding communication utility stuff on a service change?
We did a service change at a office building that has several businesses, it took something like 2 years for the six meter pack to arrive, its a standard 120/240 service the service entrance is 500 kcmil x 2 sets. water system is PVC we installed two new ground rods. All went well except now
the inspector is saying we now need to ground the communications 'to code' what is he talking about? He says 'its in the code'. There are like 6 businesses with various systems looks to be old phone, cable internet and even a 'dish network' (satellite dish). The old telco stuff is way on the other side of the building and has what looks to be its own ground rod. What are the requirements for this? Do I run a #8 solid or a 6 or what?
I have never been called on this before, but this is a service replacement. On a new build the utility just comes out and does their thing, do I call each utility?. Are EC's responsible for grounding communication utility stuff on a service change?