this may not be the best place to ask, but I'll start here!
We are having a new 2000kVA, 25kv/480-277, Y-Y transformer installed on an oil & gas site with both Xo and Ho bushings. Can someone comment on any codes or general practices about whether we should have the utility bring a neutral to the Ho?
At this point there may be some filtering systems installed on some small VFDs but I dont know for sure as I havent seen those onelines or bills of materials.
I dont know if there will be a need for this connection but am hoping someone can comment as stated on code requirementl for this connection, general practice or operational experience.
:dunce:
We are having a new 2000kVA, 25kv/480-277, Y-Y transformer installed on an oil & gas site with both Xo and Ho bushings. Can someone comment on any codes or general practices about whether we should have the utility bring a neutral to the Ho?
At this point there may be some filtering systems installed on some small VFDs but I dont know for sure as I havent seen those onelines or bills of materials.
I dont know if there will be a need for this connection but am hoping someone can comment as stated on code requirementl for this connection, general practice or operational experience.
:dunce: