We had a call from the customer that the electric company was going to shut power off to a apartment building for a rusted Meter socket.
The building had a 4 gang Meter and 1 was for a store. So I got a 5 gang Meter with two meters having a bypass and three with not.
Meteres came in with breakers. Panels are on opposite sides of the wall 5' away. I did not run a sSER to the new panels because in my opinion they are not a subpage.
Inspection comes and he wants a 4 wire between Meter and panel. What do I do with 3wire going to ranges upstairs to apartments?
Are these existing panels considered a sub panel?
The building had a 4 gang Meter and 1 was for a store. So I got a 5 gang Meter with two meters having a bypass and three with not.
Meteres came in with breakers. Panels are on opposite sides of the wall 5' away. I did not run a sSER to the new panels because in my opinion they are not a subpage.
Inspection comes and he wants a 4 wire between Meter and panel. What do I do with 3wire going to ranges upstairs to apartments?
Are these existing panels considered a sub panel?